No.1 ECU ground runs carried out successfully
15 June 2021
Radio remote head metal work completed
7 June 2021
8.33kHz radio install started
1 June 2021
Engine and airframe prepped for ground run
24 May 2021
Fuel leak from No.1 ECU traced
18 May 2021
Preparation for ground runs
11 May 2021
AC generators fitted and wired up
4 May 2021
Sliding fairing refitted
30 March 2021
AFCS and ASE system testing
22 March 2021
Main rotor blade
16 March 2021
Main rotor head rigging
10 March 2021
AFCS system BITE checks started.
22 January 2021