Blog

Radio remote head metal work completed

Work continued this week:

• Radio remote head metal work completed

• Wiring and circuit breakers for remote head and USB run through centre console

• Replacement starter motor fitted to No.2 engine

• Fuel flow light panel repaired with new filaments soldered in

• No.1 ECU L.P cock magnetic indicator replaced

• Replacement CAC fitted and tested – satis

• AFCS system functional tests continued

Work continued this week:

• Continue major service

• MODs research.

• Research/fault find Bar Alt system.

• Anti-det run of No.1 engine

twentytwopl 7 June 2021 Uncategorised

Blog post image
Blog post image