• MOD’s research continued.
• Both AC generators fitted and wired up.
• Accessory drive actuator functional tested.
• No.1 engine prepped for ground running.
• Sorting of spare components continued.
• Aircraft and bay moved to front of the hangar to facilitate fuel flow checks etc.
• Continue major service.
• MODs research.
• System testing.