Blog
Signal processor and tracking units fitted
12 November 2024
System Repairs, Nose Leg Replaced, Driveshaft Bolts Fitted
24 October 2024
Nose wheel steering manifold electrically connected.
14 November 2023
Hydraulic pump mounts fitted to MRGB
30 October 2023
AGS inspected, batched and logged
9 August 2022
Newly arrived blades from Everett’s unloaded
8 March 2022
Lynx XZ179 in the air again
28 February 2022
Lynx XZ179 takes to the air
14 February 2022
Aircraft prepared for ground runs and flight testing
1 February 2022
Post first flight inspections continued
10 January 2022
First Two Hovers Carried Out Successfully
23 December 2021
Starboard rear traveller wheels stripped and resealed
21 December 2021