Work continued this week:
ZD252 (G-NCKZ):
- Various newly arrived components and AGS inspected, batched and logged.
- Port collector tank low level float switch tested, found satis.
- New ring tags fitted to port collector tank low level float switch and float switch fitted.
- Cables in area of port collector tank low level float switch re-loomed as required.
- Fuel pipes in stbd aft belly bay removed for cleaning and inspection.
- Fuel pipes from stbd aft belly bay cleaned and inspected, found satis.
- Stbd main fuel tank internal pipes removed for cleaning and inspection.
- Stbd main fuel tank pipes cleaned and inspected, found satis.
- Stbd main fuel tank pipes refitted with new seals as required.
- Stbd main fuel tank mid-level fuel float switch tested, found satis.
- Stbd collector tank internal fuel pipes removed for cleaning/inspection.
- Stbd collector tank internal fuel pipes cleaned and inspected, found satis.
- New ring tags fitted to stbd main fuel tank low level float switch and float switch fitted.
- Cleaning and inspection of stbd main bag fuel tank begun.
- Refuel/defuel valve overhaul/re-sealing procedure investigated, manual acquired.
- Begin to strip refuel/defuel valves for re-seal.
- Investigate test/overhaul procedure for pressure switches.
- 25 and 50 amp circuit breakers in aft equipment bay fitted.
ZD266:
- No.2 ECU bay hoovered and cleaned.
- Area around MRGB hoovered and cleaned.
XZ179 (G-NCKS):
- Scheduled maintenance carried out as required.
Work ongoing:
ZD252 (G-NCKZ):
- Continue to rebuild/inspect port collector tank fuel system.
- Continue to rebuild/inspect stbd main fuel tank system.
- Continue to rebuild/inspect fuel system in aft belly area.
- Begin strip and inspection of port main fuel tank.
- Continue to rebuild/inspect stbd collector tank fuel system.
- Continue overhaul/re-seal of refuel defuel valves.
- Fit new ring tag terminals to cut cables in aft avionics bay and reconnect newly fitted circuit breakers.
ZD266:
- Continue to clean airframe to facilitate inspection.