Blog

Post first flight inspections continued

Work continued this week:

XZ179:

• Post first flight inspections continued

• Hydraulic Cooling Fan failure investigated – fan found U/S

• Investigate failed magnetic indicators and replace as required, one found to require new pin.

• Investigate AFCS Yaw Lane 1 snag

• Remove and replace No.2 FCU Throttle Control Valve

• Bleed FCU post replacement of Throttle Control Valve

• Carry out throttle pressurising valve test

• Tail Nav Light bulb replaced and tested satis

Work to be continued:

XZ179:

• Complete post flight inspections

• Re-pin magnetic indicator cable and fit final magnetic indicators

• Continue investigation of AFCS Yaw Lane 1 snag

• Drain and flush main rotor gearbox

twentytwopl 10 January 2022 Uncategorised

Blog post image
Blog post image

SIGN UP TO OUR NEWSLETTER

Lorem ipsum dolor, sit amet consectetur adipisicing elit. Illo obcaecati accusamus architecto recusandae necessitatibus incidunt quidem nam earum fuga optio cum suscipit quam quas, molestias explicabo voluptatibus officiis dicta minima!