Signal processor and tracking units fitted
Work continued this week:
ZD252 (G-NCKZ):
- Sea Owl PID turret assembly slave refitted for testing
- Tracking and signal processor units fitted
- Functional testing of PID carried out
- MRH bolts wire-locked and shrouds fitted
- Pitch control rods fitted with bonding leads
twentytwopl 12 November 2024 Uncategorised