Blog

Signal processor and tracking units fitted

Work continued this week:

ZD252 (G-NCKZ):

  • Sea Owl PID turret assembly slave refitted for testing
  • Tracking and signal processor units fitted
  • Functional testing of PID carried out
  • MRH bolts wire-locked and shrouds fitted
  • Pitch control rods fitted with bonding leads

twentytwopl 12 November 2024 Uncategorised

Blog post image
Blog post image