Work continued this week:

• Defueled aircraft completely.

• Fitted new components and seals to fuel system

• Refuelled aircraft and left to check for leaks (none currently evident)

• Research into already embodied MODs

• New rotor brake selector valve started to be fitted to complete a MOD.

• Started preparing engine bay fire wall MOD

• Standby horizon system serviceable.

• Tested transfer pumps and valves and cockpit indications.

Work to be continued next week:

• Continue antinode weight inspections

• Check fuel system for any new leaks

• Continue MRGB gimbal ring inspections.

• Continue with engine bay firewall MOD

twentytwopl 31 July 2020 Uncategorised