• Defueled aircraft completely.
• Fitted new components and seals to fuel system
• Refuelled aircraft and left to check for leaks (none currently evident)
• Research into already embodied MODs
• New rotor brake selector valve started to be fitted to complete a MOD.
• Started preparing engine bay fire wall MOD
• Standby horizon system serviceable.
• Tested transfer pumps and valves and cockpit indications.
• Continue antinode weight inspections
• Check fuel system for any new leaks
• Continue MRGB gimbal ring inspections.
• Continue with engine bay firewall MOD
twentytwopl 31 July 2020 Uncategorised