Centre Console Rebuild Begun

Work continued this week:
• Fuel system inspected for leaks – no evidence of leaks found.
• Ferry tank connection valve dismantled to investigate overflow – seal
found perished, investigation into finding new seal carried out.
• Re-familiarisation with control system and finding AGS to fit components.
• Fore and aft position transmitter fitted under P1 seat.
• Rebuild of ECU throttle box continued.
• No.5 Drive shaft fitted with new bolts and paperwork completed.
• Centre console rebuild begun buy starting to determine the missing
components and looking for loose cables before applying power.
• Bonding leads fitted to sump panels and pipes in the under floor fuel
system
• Velcro fitted to interior ready for soundproofing to be refitted at end of
rebuild.
Work to be continued next week:
• Continue with centre console rebuild.
• Continue with control system ordering AGS and fitting components if
possible.
• Meeting with film crew about documentary.
• Replace seals in the ferry tank valve (if they arrive) – refuel rest of system
if leak solved.
• Check tail rotor control cables for serviceability.

twentytwopl 19 June 2020 Uncategorised

Blog post image
Blog post image
Blog post image

SIGN UP TO OUR NEWSLETTER

Lorem ipsum dolor, sit amet consectetur adipisicing elit. Illo obcaecati accusamus architecto recusandae necessitatibus incidunt quidem nam earum fuga optio cum suscipit quam quas, molestias explicabo voluptatibus officiis dicta minima!