• Aircraft de-jacked after alignment checks
• Aircraft prepared for ground running
• AFCS system fault finding/testing
• Ground run carried out
• Replacement controller engaging ordered
• MRH spider arm wear check carried out
• Crash switches test looms started to be made
• Aircraft bonding check to be carried out
• Seal nose bay door seals with PRC when delivered
• Environmental control system to be inspected/tested