• Aircraft bonding checks completed
• Fault finding of aircraft crash switches carried out – new fire bottle cross feed switch ordered
• Unloaded XZ678 after arrival
• XZ678 cabin unloaded and sound proofing removed along with interior and cleaning started
• Serial numbers for engine and driveshafts collected for checking life details
• Sorting and batching of new spares
• Fault finding of No.1 torque indicating system started
• RTI’s investigated
• Seal nose bay door seals with PRC
• Continue No.1 torque system fault finding
• Fit fire extinguisher cross feed switch if it arrives
twentytwopl 19 October 2021 Uncategorised