Blog

Aircraft bonding checks completed

Work continued this week:

• Aircraft bonding checks completed

• Fault finding of aircraft crash switches carried out – new fire bottle cross feed switch ordered

• Unloaded XZ678 after arrival

• XZ678 cabin unloaded and sound proofing removed along with interior and cleaning started

• Serial numbers for engine and driveshafts collected for checking life details

• Sorting and batching of new spares

• Fault finding of No.1 torque indicating system started

• RTI’s investigated

Work to be continued next week:

• Seal nose bay door seals with PRC

• Continue No.1 torque system fault finding

• Fit fire extinguisher cross feed switch if it arrives

twentytwopl 19 October 2021 Uncategorised

Blog post image
Blog post image
Blog post image
Blog post image
Blog post image
Blog post image