Work started this week:

• ADC filter fitted

• Starter generator cabling inspected and continuity checks carried out

• Rotor head packed for transport

• New rotor head removed from aircraft and delivered to north weald

• No.5 driveshaft MOD states research carried out and AGS required

• Tooling required for rotor head overhaul located

• ECU inspections completed

• ECU MOD state research carried out

• MRGB oil cooler test box switch repaired

Work to be started next week:

• Finish refitting hydraulic system piping P-clips

• Order AGS for No.5 driveshaft and fit if delivered

• Create AGS list for ECU bays