• ADC filter fitted
• Starter generator cabling inspected and continuity checks carried out
• Rotor head packed for transport
• New rotor head removed from aircraft and delivered to north weald
• No.5 driveshaft MOD states research carried out and AGS required
• Tooling required for rotor head overhaul located
• ECU inspections completed
• ECU MOD state research carried out
• MRGB oil cooler test box switch repaired
• Finish refitting hydraulic system piping P-clips
• Order AGS for No.5 driveshaft and fit if delivered
• Create AGS list for ECU bays
twentytwopl 24 April 2020 Uncategorised